Building the express road Noi Bai - Ha Long of 144 km with 4 lanes of vehicles in the initial time and 6 - 8 lanes of vehicles in the future, building and putting in use the Uong Bi - Ha Long section by 2010.
Building the express road Lang - Hoa Lac of 30 km with 6 - 8 lanes of vehicles, building two lanes of vehicle section in the first period; completely upgrading national road No.5 by 2000 as well as upgrading national roads No.l8, No.1 0 ; the fan-blade roads from Ha Noi to other provinces and cities within the diameter of 70 km including national roads : No.2, No.3, No.6,No.32 will be enlarged up to 4 - 6 lanes of vehicles.
Linking and upgrading the North belt road lines (the system of national roads No.4A No.4B, No.4C, No.4D, No.4E, No.279, No.37); newly building the roads avoiding flood after building Son La hydro-electric plant.