I   HomePage     I  Feed back   I  Vietnamese
 
Introduction
Features of the river basin
Water resources
Agriculture
Hydraulic works
Hydraulic works management
Flood control and natural disaster mitigation
Hydropower
Fishery
Transport
Urban infrastructure construction
Planning
Science and technology
International cooperation
Activities by the Office
Newsletter
Legal documents


Hit Counter





_Weblink
 
 
 
NATURAL DISASTER MITIGATION WORKS
 

            The dyke system has been completed which include the river dyke, sea dyke and sluices under dyke. The total dyke length on main rivers is 2,700 km, sea dyke 310 km. The river dyke system can cope with the flood level of 13.4 m in Hanoi, and 7.21 m in Pha Lai. The sea dyke is designed to prevent saline intrusion in the event of 9 grade stormed combined with high tide.

             In order to reduce downstream flood, most of the upstream reservoirs involve in the flood absorption, namely Thac ba, Hoa binh, Nui coc, Cam son... In the future, there will be reservoirs of Son la and Tuyen quang. As a result, the flood and drought will be better controlled.

 

 

 
HOT NEWS
 

HyperLink
HyperLink
HyperLink

_ Tools
  Acrobat pdf
  Mapinfo pro


 
Red River Basin Organization Office * Institute of Water resources planning
162A Tran Quang Khai, Hanoi, Vietnam\Tel: 84-4 8267020 Fax: 84-4 8252807 Email:iwrp.hanoi@hn.vnn.vn